Work Area Management 1

I have been talking on the need for a Work Area Management policy for Mumbai/MMR for very long and this is my first or so blog post. The government needs to look into the enormous inconvenience faced by people during civil works. Every year has some new requirement, utilities have to be laid, roads have to be repaired or remade. Dust, labour standards, noise, materials management are the four key components and every civic contract (using tax payers money) should abide by policy guidelines.

Two weeks back I raised alarm over the shocking levels of dust from the Marine Drive resurfacing and captured it in a video here, sent a letter and the issue was covered in a newspaper article as well. The video link is here

Marine Drive ToI article Marine Drive dust letter MCGM

The experience captured in pics below is from today. The whole Horniman Circle is being relaid, paver blocks being scooped out and asphalt coming in place. Pictures are below.

Following stands out

1. The existing paver block surface is/was exceptionally good. The case for asaphalt is valid but then paver block surfaces, which are laid out well (and have good ride quality) should be replaced only when the quality starts wearing out. There are hundreds of junctions which are in a bad condition in the city and priority suggests that they should be attended to first.

2. The high level of traffic chaos is evident. The photos do not capture the incessant honking by the vehicles. This leads to point 4.

3. There are high dust levels on the road which is then blown up due to cars and pedestrians entering local establishments as well.

4. The whole work can clearly be carried out in the night since this is a purely commercial area with no residential population which would face disturbance. Work should be carried out in phases and minimal work during day time. The Additional Municipal Commissioner in charge of roads has in one of the news articles remarked that “….constructing or improving roads in Mumbai is like performing a heart surgery on a man who is refusing to even lie down.” There are enough locations where the complete work can be completed between 11pm- 7am. The processes and technology in use currently is clearly outdated and from an altogether different era.

Below is the chaos left over from the Reliance JIO optic fibre work across the city. Every road and by lane has this kind of a scene. I lodged a complaint on 1916 10 days bak but only got a complaint number and no redressal.

WP_20150401_005 WP_20150401_007 WP_20150401_001 WP_20150401_002 WP_20150401_003 WP_20150401_004

Below is an electricity cable being laid at 9:30 am at junction of S V Road and Amboli i Andheri (W). The work took up almost one lane. Being peak hour it lead to traffic pile up on all sides. Again should be done at night or between 6-8 am.

BEST Amboli-SV Road 2 BEST Amboli-SV Road

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s